Projects

Assembly Park: Gardens, Plaza, and Studios

Year
2022
Status
Built

The temporary community spaces known as Assembly Gardens, Assembly Plaza, and Assembly Studios optimize a site in transition to provide the local community with an outlet for creativity and gathering. Designed as a model for placemaking with a limited budget, the trio of public spaces inserts itself in the north-west quadrant of Assembly Park, a master planned, mixed-use community currently under construction. Scheduled to be completed in 2034, Assembly Park builds-in diversity and durability to ultimately house 23,000 people and includes animated pedestrian retail spaces, a network of green spaces, and areas for public gathering.

The temporary community spaces known as Assembly Gardens, Assembly Plaza, and Assembly Studios optimize a site in transition to provide the local community with an outlet for creativity and gathering. Designed as a model for placemaking with a limited budget, the trio of public spaces inserts itself in the north-west quadrant of Assembly Park, a master planned, mixed-use community currently under construction. Scheduled to be completed in 2034, Assembly Park builds-in diversity and durability to ultimately house 23,000 people and includes animated pedestrian retail spaces, a network of green spaces, and areas for public gathering.

Collaborators

1
Similar ImagesRelated Projects