Projects

Češča Vas Pool Complex

Year
2023
Status
Built
Firm
ENOTA

The construction of the new pool complex Češča vas is envisaged in a space dominated by the existing, recently renovated velodrome. It is our preference not to drastically alter the spatial relationships with the erection of the new swimming pool facility as it would introduce disorder that the space could do without, and further saturate it. The new pool facility thus takes advantage of the topographic properties of the inclined terrain. It is sited as low as possible and does not constitute a new dominant in the space.

The construction of the new pool complex Češča vas is envisaged in a space dominated by the existing, recently renovated velodrome. It is our preference not to drastically alter the spatial relationships with the erection of the new swimming pool facility as it would introduce disorder that the space could do without, and further saturate it. The new pool facility thus takes advantage of the topographic properties of the inclined terrain. It is sited as low as possible and does not constitute a new dominant in the space.

Collaborators

1
Similar ImagesRelated Projects
Češča Vas Pool Complex — Architizer