- Year
- 2021
- Status
- Built
- Firm
- MIAS ARCHITECTS
- Location
- Barcelona, Spain
In Collaboration with Leitner. The aim of the project is to design a train improving operations and user comfortability, incorporating updates for the security system and providing easier maintenance. The speed of the funicular will increase up to 10 meters per second, which it will allow more trips per hour and increase the passenger capacity from the current 120 to 252 seats. The duration of the trip will be approximately 3 minutes at maximum speed. With the refurbishment, the funicular will be called “Cuca de Llum”, and it will be integrated into the Park as if it were just another attraction.