Projects

Greeley Memorial Laboratory

Year
2013
Status
Built

"The goal was to transform the lobby and corridor back to its original condition while adapting it to today's programmatic needs. This 24,000 SF International Style concrete and glass structure was completed in 1959. Over the years, many inappropriate 'add-ons' were inflicted upon the interior of the building. Among these included the haphazard construction of make-shift gypsum board offices within the main lobby; stringing of random wire on the natural cherry panels lining the public spaces; mounting of electrical conduit on the panels and the underside of the sculptural concrete roof that doubles as the rhythmically undulating ceiling.

"The goal was to transform the lobby and corridor back to its original condition while adapting it to today's programmatic needs. This 24,000 SF International Style concrete and glass structure was completed in 1959. Over the years, many inappropriate 'add-ons' were inflicted upon the interior of the building. Among these included the haphazard construction of make-shift gypsum board offices within the main lobby; stringing of random wire on the natural cherry panels lining the public spaces; mounting of electrical conduit on the panels and the underside of the sculptural concrete roof that doubles as the rhythmically undulating ceiling.

Collaborators

1
Similar ImagesRelated Projects