Projects

Hydroelectric power plant Töging

Year
2022
Status
Built

The existing and listed power plant area from 1924 could no longer be adapted for the changed new technical power plant parts, which is why the user decided to build a new building next to the existing one. In order to be able to integrate the large-scale technology of a hydroelectric power plant, including its massive pipelines, into the environment and to avoid disturbing the historic existing building, we decided to let the new power plant recede into the background as much as possible. The massive new building was largely integrated into the site underground.

The existing and listed power plant area from 1924 could no longer be adapted for the changed new technical power plant parts, which is why the user decided to build a new building next to the existing one. In order to be able to integrate the large-scale technology of a hydroelectric power plant, including its massive pipelines, into the environment and to avoid disturbing the historic existing building, we decided to let the new power plant recede into the background as much as possible. The massive new building was largely integrated into the site underground.

Collaborators

1
Similar ImagesRelated Projects