Projects

Kansas City Current Training Faciltiy

Year
2022
Status
Built

The NWSL Kansas City Current Training Facility is the first purpose-built complex for a women's professional soccer team in North America. It is also the first professional training facility to be built with a cross-laminated and mass timber structure, making it historically significant, but also an innovation in environmental design. With 50-60% lower embodied carbon than other construction methods, the design complements the glulam columns, beams and CLT panels via metal cladding and glass. The lightweight wood and prefabricated components made the structure fast to construct, taking less than two months from shipment to a completely vertical 17,600-square-foot facility.

The NWSL Kansas City Current Training Facility is the first purpose-built complex for a women's professional soccer team in North America. It is also the first professional training facility to be built with a cross-laminated and mass timber structure, making it historically significant, but also an innovation in environmental design. With 50-60% lower embodied carbon than other construction methods, the design complements the glulam columns, beams and CLT panels via metal cladding and glass. The lightweight wood and prefabricated components made the structure fast to construct, taking less than two months from shipment to a completely vertical 17,600-square-foot facility.

Collaborators

1
Similar ImagesRelated Projects
Kansas City Current Training Faciltiy — Architizer