Projects
Year
2020
Status
Built

The total built-up area of the project is 41100 square meters with a plan size of roughly 250 meters by 200 meters. The architecture is designed as the training base for national teams of extreme sports, providing skateboard skatepark, skateboard street, vert ramp, wind tunnel, BMX freestyle, surfing; wall climbing etc. Its infrastructure for skateboarding meets the standards for world championships and Olympics. Coexistence with environment: The contour of architecture is the shape of plum blossom.

The total built-up area of the project is 41100 square meters with a plan size of roughly 250 meters by 200 meters. The architecture is designed as the training base for national teams of extreme sports, providing skateboard skatepark, skateboard street, vert ramp, wind tunnel, BMX freestyle, surfing; wall climbing etc. Its infrastructure for skateboarding meets the standards for world championships and Olympics. Coexistence with environment: The contour of architecture is the shape of plum blossom.

Collaborators

1
Similar ImagesRelated Projects
National Extreme Sports Stadium (Lishui Training Base) — Architizer