Projects
Year
2013
Status
Built

Photographer: Jörg Hempel The location of the bridge so close to the harbour's storage tanks was of particular concern at the design stage. The oil depot is used for the transfer and storage of highly flammable substances. For this reason, the bridge had to be designed to prevent people on the bridge gaining access to the passing tankers, or at least to make it difficult. In view of these exacting circumstances, a solution was developed that not only fulfils all the safety requirements, but also takes into account the specific location of the bridge on the River Main.

Photographer: Jörg Hempel The location of the bridge so close to the harbour's storage tanks was of particular concern at the design stage. The oil depot is used for the transfer and storage of highly flammable substances. For this reason, the bridge had to be designed to prevent people on the bridge gaining access to the passing tankers, or at least to make it difficult. In view of these exacting circumstances, a solution was developed that not only fulfils all the safety requirements, but also takes into account the specific location of the bridge on the River Main.

Collaborators

1
Similar ImagesRelated Projects