Projects

Shenzhen International Airport

Year
2020
Status
Built
Location

On 11.28.2013 the new Terminal 3 at Shenzhen International Airport has opened after just five years of planning and construction. With an overall length of 1500 m and a gross floor space of 500,000 m², it increases the capacity of the existing airport in future by up to 40 million passengers per year. The project is the result of an international competition held in 2008, from which the team of Italian architect Massimiliano Fuksas supported by German engineers Knippers Helbig emerged victorious. Based on a given building organisation and floor plan structure, a freely shaped terminal design was developed.

On 11.28.2013 the new Terminal 3 at Shenzhen International Airport has opened after just five years of planning and construction. With an overall length of 1500 m and a gross floor space of 500,000 m², it increases the capacity of the existing airport in future by up to 40 million passengers per year. The project is the result of an international competition held in 2008, from which the team of Italian architect Massimiliano Fuksas supported by German engineers Knippers Helbig emerged victorious. Based on a given building organisation and floor plan structure, a freely shaped terminal design was developed.

Collaborators

1
Similar ImagesRelated Projects