Having opened to the public in February 2018, The Block is already performing exceptionally well, with 2 large festivals being held at the venue within its first month of opening alone. During the 7-month construction period, over 700 surplus concrete blocks left on the site by the Dubai Canal’s developers were stacked to create a multitude of features and play items. This was the central design direction which defined the park’s aesthetic, but also prevented over 20,000 tonnes of concrete which was otherwise destined for landfill.