None of the floors of these neighbouring buildings were corresponding. The challenge was to make all of the floors accessible for wheelchair users. Therefore the location of elevators and staircases was very carefully thought of. Since it’s central location in the city, the new entrance building was designed to be a contemporary ‘landmark’ on the main road of Harelbeke. Therefore the cladding of the facade and the roof was executed in a dirt repelling white material. The material is a mineral substance of the brand Corian.
It is the first time in Belgium that this material is used as exterior cladding.Furthermore, part of the historical flax-factory was renovated. The walls and roof of this part were carefully preserved and restored according to the recommendations of the institute of cultural heritage.On the inside of this historical part, the pattern of the tiled floors refer to a weaving technique, to make the link with the history of this building.Sustainability was an important aspect in the building process. No cooling was installed in this office building.
Due to the high degree of isolation, the use of windowblinds and the white colour of the cladding, overheating of the building can be avoided for the Belgian mild summer climate.In a next phase the central spot in the site will be transformed into an atrium, in order to centralise all of the city services so the current and future needs of the civilians can easily be satisfied.